Tuesday- My mom went over during the day and got the linen door hung and she cleaned some windows. Part of Oliver's window will need replaces because a seal is broken. She also swept the bedrooms and bathrooms.
Wednesday- Josh spent the time digging. I don't remember if I mentioned it before, but while they were digging the post holes for the deck, they ran into a kitchen pipe. It turns out that the pipe is just run out to the yard and not really going anywhere. It wasn't hooked up to our septic. So now he has been digging in the back yard to run pipes from the kitchen to the septic tank.
Thursday- I was able to go over during the day and touch up the blue in the kitchen. I took the hinges off the lower cabinets to get ready for paint. Josh told me not to paint until they were hung because he doesn't want to mess them up or wait for them to dry. Later that day, I bought knobs and pulls for the cabinets.
Friday- Josh was still digging. I went over in the evening and put a second coat of white on the upper cabinets. Josh sanded the bathroom walls to get ready for paint and we bought a kitchen faucet. He said his dad has a kitchen sink that we can have and we are getting a laundry room sink from his step-dad, Eric.
Saturday- There were a lot of visitors at the house. The only thing Josh told me was that he finished digging and it's ready for pipe to be laid.
Sunday- I'm not sure. Josh went over for a few hours then came home to watch Nascar. When he came back, the kids and I were napping. After we woke up, he fell asleep at 7pm and was done for the night.






No comments:
Post a Comment