Sunday, March 29, 2015

Day 70

Thankfully, a lot has gotten done this weekend.  Below is the list I made for the bedrooms and the hallway.  They are hung up in each room and says what needs done to complete the room.  It's mostly for my mom, so she knows what needs done if she decides to go over by herself.  Some things have already been crossed off.
 
 
Yesterday she put a third coat of paint in Penelope's closet, so that's done now.  No more painting for her room.  (I hope) She also put a second coat of grey and teal in our room so we just need our closet painted now. 

Josh has been working on building this little wall for the bar in the kitchen.  See our new door to the garage?  It has a built-in shade.  It's just covered in cardboard so it doesn't get beat up and scratched.

 
The kitchen lights are starting to go up too.  I really like how it looks and how big it is.  I can't wait to see them both up and working. The guys have been working on patching up the ceiling too.  But that is going to take a while still.  The walls seem done, just need sanded down.  Then paint!

 
The bedrooms lights are up now too.  All of them are the same and the one I have for the hall is just brown instead of silver.
 
 
The tiles from Menard's finally came in!  Thank goodness, I was getting tired of waiting.  Josh bought concrete boards and I'm not sure if we are tiling under the cabinets or not. It will probably be easier to just tile everything, but we won't use as much tile if we don't tile under the cabinets.  I'll leave that up to Josh. 
 
He also has all the tile glued down in the bathroom and just needs to grout it now.  Then the toilet can be installed.  Soon he is going to start building the vanity.   We know someone who can get things like bathroom sinks and toilets at cost, so we need to order 3 sinks and a toilet from him.  We have one toilet that is salvageable.
 
I'm not sure what the plan is for the week coming up.  Probably bathroom and kitchen stuff.