Wednesday, January 28, 2015

Day 10

Yesterday was the first day that I didn't go to the house. And I went today at lunch time with the kids, but it's stressful because I have to hold Oliver and try to hold Penelope's hand because there are many things she can and shouldn't get into.  I took a blanket and laid it down in her future room and we had lunch there, but she was still distracted and wanting to run away.

Josh's dad is still working on the drywall in the upstairs bathroom and today Josh bought some wainscoting.  I think tomorrow they are going to work on plumbing both bathrooms. 

Josh totally gutting the downstairs bathroom and the 4th bedroom (future laundry) and knocked out the wall between them.  It's hard to tell in the picture, but I think the new wall will go to about where the toilet is.  Besides a walk-in/door-less shower and double vanity, I have no vision for the bathroom.

They are almost done gutting the house.  Just need to do the laminate floors and the kitchen now.  I'm getting excited that we are going to start building more and destroying less ;)




 
BEFORE
 
 
BEFORE

 


2 comments:

  1. so if the wall is going where the toilet is, how are you expanding the bathroom?
    -faith

    ReplyDelete
  2. I think she means where the toilet is sitting now---now where the toilet will be.

    ReplyDelete